For Homeowners

A healthier more efficient home.

Biofill™ replaces standard fiberglass insulation with a pourable hemp-and-lime wall that breathes, resists mold, and stores carbon for the life of your home. Poured by a pro, not sprayed with chemicals.

Is Biofill right for my project?

Biofill goes into standard stud framing during the rough-in phase. What that looks like depends on where you’re starting from.

New construction

The most common use. Biofill pours into standard stud walls or precast walls before finishing. No separate insulation, drywall, or vapor-barrier trade needed.

Renovation

If you’re opening walls anyway for an addition or full gut renovation, Biofill installs during the same rough-in phase as insulation would.

Retrofit

Wall retrofits usually mean removing existing insulation and prepping the cavity. Best paired with a contractor who’s worked on hemp-lime wall assemblies.

What to ask your builder

Grab our free checklist – the short list of questions to ask any contractor before they quote Biofill into your project.

Get the full checklist (PDF)

Financing your build

Talking to your lender about a hemp home?

Our Lender Kit gives your bank or credit union the appraisal comps, code references, and product data they’ll need to underwrite a Biofill™ project with confidence.

Frequently asked questions

Can I install Biofill myself, or do I need a certified builder?

Biofill is a professional-install product. It’s poured into standard wall framing, and proper mixing and pour technique directly affects cure strength and R-value, so we recommend working with a certified installer or an experienced hemp-building contractor. If you’re a hands-on homeowner, you can still buy Biofill directly and have your framer or general contractor place it — we’re happy to walk your contractor through the process. Our installer certification program (currently in development) will make it easier to find pros who’ve been trained on Biofill specifically.

Material line-item is higher than fiberglass. But because Biofill collapses several layers (insulation, sheathing prep, vapor barrier) into one pour, total installed cost tends to land close to conventional stud-frame construction — with a much healthier, longer-lasting wall.

Biofill sets in under an hour and can be poured at roughly the speed of a standard concrete pour. On a new build, expect 1–3 days of pour work versus 1–3 weeks for hand-tamped hempcrete alternatives.

Hemp-lime wall assemblies are recognized in the 2024 IRC Appendix BL and are being adopted state by state. If your local official hasn’t reviewed one yet, our Permit Kit gives them the code references and inspector FAQ they’ll need. Insurers are catching up — familiarity varies by carrier.

It’s the woody core of the hemp plant — the part left over after fiber processing. Mixed with lime and water, it becomes Biofill: a solid, breathable insulation that stores carbon instead of releasing it.

Have more questions?

Download the Biofill™ B2B Info Sheet

Enter your name and email to access this download. We’ll also send it to your inbox.

No spam. Unsubscribe anytime.

Download the Biofill™ Homeowner Handout

Enter your name and email to access this download. We’ll also send it to your inbox.

No spam. Unsubscribe anytime.

Download the Pre-Pour Trade Checklist

Enter your name and email to access this download. We’ll also send it to your inbox.

No spam. Unsubscribe anytime.

Download the BIND/R™ Safety Data Sheet

Enter your name and email to access this download. We’ll also send it to your inbox.

No spam. Unsubscribe anytime.

Download the UNL Testing Report

Enter your name and email to access this download. We’ll also send it to your inbox.

No spam. Unsubscribe anytime.

Request Documents

Enter your name and email to get the installation guide starter pack.

No spam. Unsubscribe anytime.

Download the Biofill™ Project Submittal Template

Enter your name and email to access this download. We’ll also send it to your inbox.

No spam. Unsubscribe anytime.